What Is a Call Sheet?
A call sheet is the daily briefing that tells cast, crew, and contributors when and where to report for a shoot, what is scheduled, and whom to contact if plans change. It covers one production day. A good call sheet lets a guest find the correct entrance and know when to arrive without needing the producer to translate the schedule by phone.
Read the call that applies to you
The general call, sometimes called the unit call, is when most of the crew is expected to report. Some people have an earlier pre-call to get the set ready. A contributor may have a later arrival for wardrobe, a microphone fitting, or briefing. Their arrival and the first camera roll are two separate times. If you have an individual call, use that time and check where it expects you to be.
Put the project name, shoot date, time zone, and version near the top. Give the reporting location, exact entrance or meeting point, and a production contact. Add loading and parking information when someone could reasonably choose the wrong door. Below that, list each work block, the people needed, and the planned breaks, moves, and wrap. Include any access, accessibility, or safety information the crew needs and point them to separate paperwork when relevant.
On larger scripted shoots, the second assistant director commonly prepares the daily sheet in coordination with production and departments. On a small interview crew, the producer may handle it. Either way, someone needs to confirm that the schedule, access, and individual calls agree before the crew reads them as instructions.
Schedule a guest before the cameras roll
Say a crew has a one-hour interview slot in an office and access through two entrances. Gear must come through a service gate. The guest should use reception. Both routes lead to the same building, but the service gate opens only for deliveries.
- 07:45, camera and lighting pre-call. Report to the service gate with gear. Confirm the building contact can admit the crew then.
- 08:15, general crew call. Report to the interview room. Leave time to test camera and recorder sync before the guest arrives.
- 08:45, guest call. Meet the coordinator at reception for a short briefing and mic fitting.
- 09:00, interview roll. Record the interview in the booked room. Hold a few minutes before releasing the guest to check the recording and capture matching room tone.
- 10:00, room handback. Work backward from this deadline. Allow enough time to reset the room and move equipment out.
If the facility changes the service-gate opening to 08:15, the early call no longer buys rigging time. Check whether there is an approved alternate load-in, or shorten the camera setup and notify the people whose instructions changed. Moving every call later without checking the room booking could cost the final questions.
Issue a version people can act on
Before sending, read the sheet from a guest's and a crew member's perspectives. Can each find their reporting time, entrance, and contact? Is travel time between locations accounted for? Do departments have the prep time promised in the schedule? Check version changes against the booking, equipment plan, and the shot list. A call sheet sets the day's logistics. The shot list holds the specific frames the editor needs.
For a revision, mark the new version and say exactly what moved. Ask the affected people to acknowledge changes that alter their arrival or access. Keep the latest version easy to find, and share personal phone numbers and private access instructions only with people who need them. ScreenSkills' production handbook covers coordination and secure distribution.